Open-Concept Kitchen Remodel in Jacksonville, FL

  • Location:

    St. Johns, FL

  • Project Type: Full Kitchen Remodel
  • Location: Jacksonville, FL (32259)
  • Build Timeline: 10 weeks

A kitchen doesn’t have to be big to be a problem. Sometimes the trouble is that it’s cramped, closed off from the surrounding rooms, and short on the storage and counter space a household needs. This Jacksonville homeowner had a small, outdated kitchen, dining, and living space. Each area felt separate, and none of them worked as well as they could. She wanted an open floor plan, more cabinetry, more prep space, and a place to eat quick meals, all without giving up her formal dining area.

‍
The budget made the project more meaningful. The funds were a gift from her mom, so every decision had to count. She came to Corbella Kitchen and Bath through a word-of-mouth referral, and that first conversation grew into a project we’re proud of.

The Goals

The homeowner came to us with a focused wish list:

  • More cabinet space. Storage was a daily frustration in the existing kitchen.
  • More prep area. She wanted real, usable counter space for cooking.
  • An informal place to eat. A spot for quick meals, separate from the formal dining room.
  • A formal dining area. She wanted to keep it, not trade it away for the open layout.
  • An open feel. The three spaces needed to read as one connected room.
  • Cabinets to the ceiling. This was one request she was specific about from the start.

‍
Those goals can compete with each other. Opening up a floor plan usually means losing wall space, which is where cabinets live. Adding an eating area takes floor space away from the work area. Keeping the formal dining room limits how much of the footprint can be given over to the kitchen. We had to solve it all at once, on a tight budget.

A Special Project

Not every project begins the same way. This one started with a word-of-mouth referral to a homeowner in Jacksonville. When we first spoke in June of 2025, we were told that if the project happened at all, it would be in 2026. That’s a common and reasonable answer. Remodeling is a big decision, and many homeowners need time to plan, save, and think it through.
We stayed in touch, and in late February 2026 we revisited the project with them. This time we also met with the homeowner’s mom, who was providing the funds, so she could review the plan and approve it. Meeting the person behind the gift mattered. She wasn’t just writing a check. She was investing in her daughter’s home, and she deserved to see how the money would be used. In March, they signed the contract, and demolition began in May.

Design Direction

Our approach was to make the home work the way the homeowner lived in it, not just to update how it looked. The old layout had walls dividing kitchen, dining, and living areas that all needed to talk to each other. The cabinets stopped short of the ceiling, with a soffit above them that made the room feel lower and smaller. A built-in pantry took up space that could be put to better use.
That led to one guiding question: what is each part of this space doing for the homeowner, and what is just in the way? The answers shaped the whole plan.

Opening the Floor Plan: Removing Three Walls

The biggest change was removing three walls. Taking out walls is the fastest way to turn a closed-off layout into an open one, but it isn’t something to do on a hunch. Before any demolition, we had an engineer confirm that none of the three walls were load-bearing.

‍
That step matters. A load-bearing wall carries the weight of the structure above it, and removing one without the right support can cause serious problems. A non-load-bearing wall is a very different job. With the engineer’s confirmation, we could open the space without needing to reframe or add structural supports. It also gave the homeowner and her mom confidence that the project was being done properly.
With the three walls gone, the kitchen, dining, and living areas became one connected space. Light and sightlines now travel across the whole room, and someone cooking can stay part of the conversation with people in the living area. Because the project was designed around a floor plan that works as a whole, there was room to add things the old layout couldn’t hold.

The Built-In Hutch

Alongside the island, we added a built-in hutch. It provides the homeowner with more storage and additional workspace in a single piece. A built-in hutch also carries a bit of the dining area's formal feel into the kitchen, which suits a homeowner who wanted to hold on to her formal dining space.

‍
The hutch is finished to match the island, in Cattails Stain. The two pieces read as a pair, giving the open space some visual structure while the main perimeter stays lighter.

‍

Cabinetry: Designer’s Choice, Floor to Ceiling

The cabinets are from Designer’s Choice, and they make up most of what the homeowner asked for. The perimeter is finished in Moccasin. The island and hutch are in Cattails Stain, a deeper tone. Using two finishes gives the island and hutch a distinct identity within the open room, so the space doesn’t read as one long run of the same color.

Running the cabinets to the ceiling was a priority for her, and removing the soffit made it possible. A soffit is the boxed-in area above the cabinets, and it often sits there only to cover ductwork, wiring, or simply the gap above older cabinetry. Taking it out and extending the cabinets upward does two things at once. The room feels taller and more open because the eye travels along a clean line rather than stopping at a box. And the added height means additional storage, in a kitchen where storage was a top complaint.

We also removed the built-in pantry. Pantries can be valuable, but this one used up floor area that the new layout needed. The new cabinetry, island, and hutch more than make up for the storage it provided, and the space it occupied now serves the open plan.

Countertops: UMI Pompeii Quartz in Argento

For the countertops, we used UMI Pompeii Quartz in Argento. Quartz is a durable, low-maintenance surface, which matters in a kitchen that gets used every day. The Argento color works well with both cabinet finishes, the Moccasin on the perimeter and the Cattails Stain on the island and hutch.

With a larger island and more overall counter space, the quartz is a key part of how the kitchen delivers the prep area the homeowner wanted. She now has room to work, with surfaces she doesn’t need to worry about.

‍

Faucet and Backsplash

The Delta faucet at the island sink is a practical choice that fits the new layout. Because the sink now sits at the center of the room, the faucet is visible from the living and dining areas, and it needed to be both good-looking and dependable.

The SpearTek backsplash finishes the perimeter. A backsplash is one of the details that makes a kitchen feel complete, and it protects the walls behind the counters and cooktop from splashes. Paired with the quartz and the Moccasin cabinetry, it ties the main kitchen together.

More Lighting

When you remove walls and a soffit, the way light moves through a room changes. We took advantage of that and added lighting. The original space had been dim and closed in. With additional fixtures, the work areas are brighter, the island is well-lit for prep and meals, and the entire open space feels welcoming from morning to evening.

Good lighting is easy to overlook in a remodel, but it affects how every other choice looks. The cabinet finishes, the quartz, and the backsplash all look better when the room is well-lit.

The Process

The project went smoothly, with no major complications. It was completed in approximately 10 weeks. Part of that timeline came from a planned work stoppage. The homeowner’s flooring company needed to install new flooring during the job, and we paused when the timing was best for both crews.

Planning around other trades can be the difference between a remodel that runs smoothly and one that doesn’t. Flooring in an open-concept space has to be coordinated with demolition, cabinetry, and finishing work. By scheduling the pause at the right time, the project stayed on track, and the flooring and kitchen work fit together properly.

The contract was signed in March, and demolition began in May. With the walls confirmed non-load-bearing and the plan approved by both the homeowner and her mom, the work moved through demolition, construction, and installation without surprises.

The Result

The finished kitchen makes far better use of the space. The homeowner now has more cabinetry, more workspace, more lighting, and a more functional layout. Her cabinets reach the ceiling, as she wanted. She has an island for prep and quick meals, a built-in hutch for storage, and a formal dining area that is still hers.

By removing unnecessary walls and soffits, upgrading the cabinetry, adding lighting, and building in an island and hutch, we turned underused space into functional areas that fit her everyday life. It’s also a kitchen that looks good, with warm finishes, a clean ceiling line, and a layout that invites people in.

Most importantly, the project did what her mom’s gift was meant to do. It gave a homeowner a space she can enjoy for years, and it was done carefully, on budget, and with a plan.

 Ready to Start Your Kitchen Remodel?  If you’re ready for a kitchen that feels more open, functions better, and looks like it was designed with purpose, we’d love to help. Contact Corbella Kitchen & Bath to schedule a consultation and begin the design process for your kitchen remodel. Click Here